Welcome to ShantyboatLiving.com

Please sign in.

We will never release your email address to another party.!

Member Login
Lost your password?
Not a member yet? Sign Up!

Waterlodge Build

July 15, 2012
By

From the wesbite:  http://littleshantyboat.blogspot.com/   –  We are building the stringers, which are longitudinal frames.  Also, struggling with epoxy.

Build Day: Epoxy is Stressful 

http://littleshantyboat.blogspot.com/2012/07/build-day-epoxy-is-stressful.html

You know the scene at the end of any action movie where the hero has minutes to disarm the bomb, cutting the wires in just the right sequence or he blows up the 747 full of schoolkids?  Working with epoxy is just like that…

Built Day: Keel and Stringers

http://littleshantyboat.blogspot.com/2012/07/built-day-keel-and-skeg-strings.html

The process was more or less:  Lay out the pieces for fit on our plywood pattern; put wax paper under anything we didn’t want to be permanently adhered to anything below, temporarily screw down, as necessary; apply a thin coat of epoxy to both surfaces of every joint; apply a thickened coat of epoxy to one side of every joint; and finally fasten together all joints with stainless steel screws…

Bryan Lowe

The author of this post is also the editor of ShantyboatLiving.com. He has built several boats including the Escargot pictured at left. Note: Join in the shantyboat community discussion. Leave your comments, questions and thoughts below. You can also join in the discussoin on the Shantyboat forum HERE. Submit YOUR stories about any aspect of shantyboating HERE. Interested in the Moto Guzzi California Vintage Motorcycles?

More Posts

Leave a Reply



Plans


   Beat diabetes   Diabetes diet